Item Coversheet
Commission Agenda Item
 

MEETING DATE:  5/11/2015

SUBJECT:  Ordinance 15-05, Second Reading, to Amend the Official Zoning Atlas from Planned Unit Development to Planned Development - Residential on +/-41.21 Acres (Heritage Oaks) Quasi-Judicial

PREPARED BY:  Justin Tabor, AICP, Principal Planner

RECOMMENDED ACTION:

Based upon the competent substantial evidence presented at the hearing, the presentation before the Commission, and Staff’s recommendation:

 

(1) Approve the Planned Development Agreement for the Heritage Oaks PD-R Project and authorize the Mayor the sign the Agreement;

(2) Approve Ordinance 15-05 on second reading, subject to the 27 conditions provided in Exhibit "A" located on page 32 of the April 14, 2015 Staff Report to the Planning & Zoning Board, which have been incorporated into Ordinance 15-05; and,

(3) Authorize the Planned Development Agreement for the Heritage Oaks PD-R Project to be recorded with the Alachua County Clerk of Court.

 

Summary

 

This application proposes to change the zoning of the ±41.21 acre subject property, which consists of Tax Parcel Numbers 03053-001-000 and 03053-010-000 through 03053-010-054, from Planned Unit Development (PUD) to Planned Development – Residential (PD-R.) The subject property consists of the existing Heritage Oaks development and vacant land to the north of the existing development, which is also a part of the existing PUD.  

 

The subject property is located approximately 1,000 feet north of NW US Highway 441, east of Santa Fe High School, and north of Alachua Market Place (currently under construction.) Access to the site is provided by connection to NW 167th Boulevard, which runs south of the subject property to NW US Highway 441.  

 

The Heritage Oaks PUD was approved by Ordinance O-03-05, and was later amended by Ordinance 05 12. The current PUD permits a maximum of 95 single-family detached dwellings. The proposed PD-R would permit a maximum of 98 single-family detached dwellings. A total of 54 lots have been previously platted and developed as Phase I of Heritage Oaks. The proposed PD-R would permit 44 lots within Phase II, which is currently undeveloped and located north of Phase I.  

 

The application would result in minimal changes from the approved PUD. No changes are proposed in Phase I of the project (the proposed PD-R would permit a 10,000 square foot community center within Phase I.) The proposed PD-R would result in the revision of the roadway layout in Phase II. The current PUD would require the construction of four (4) roadways running north-to-south through Phase II, connected at their northern terminus by a roadway running east-to-west. The proposed PD-R would require the construction of four (4) cul-de-sac streets, connecting to existing street stubs along NW 167th Place, effectively deleting the east-to-west connector street. The proposed PD-R would also result in a net increase of three (3) single-family residential dwellings.  

 

The PD Master Plan would require larger lots along the project’s northern boundary. In addition, the project would provide a 15-foot buffer with a minimum six (6) foot fence between lots within Phase II and the rural-residential areas located to the north of the project site.   

 

Section 3.6.3(A)(7) of the City's Land Development Regulations requires that, concurrent with the approval of the adopting ordinance for a PD zoning district and the PD Master Plan, a PD Agreement be established for the project. A PD Agreement for the Heritage Oaks PD-R Project has been prepared, and is attached to the materials for this item. The PD Agreement has been signed by each of the applicants.

 

The Planning & Zoning Board held a public hearing on the proposed amendment on April 14, 2015, and voted 5-0 to find the application for a Planned Development to be consistent with the City of Alachua Comprehensive Plan and in compliance with the Land Development Regulations and transmit the application to the City Commission with a recommendation to approve, subject to the 27 conditions provided in Exhibit “A” located on page 32 of the April 14, 2015 Staff Report to the Planning & Zoning Board.


The City Commission held the first reading and public hearing of Ordinance 15-05 on April 27, 2015, and voted 5-0 to approve Ordinance 15-05 on first reading, subject to the conditions provided in Exhibit "A" located on page 32 of the April 14, 2015 Staff Report to the Planning & Zoning Board, which have been incorporated into Ordinance 15-05.

 
 
ATTACHMENTS:
Description
Staff Report
Ordinance 15-05
Heritage Oaks PD-R PD Master Plan
Heritage Oaks PD Agreement w/ Applicant Signature
Supporting Application Materials
Application & Supporting Materials - Part 1 of 2
Application & Supporting Materials - Part 2 of 2
Draft Minutes from April 14, 2015 Planning & Zoning Board Meeting
Ads, Mailer, & Posted Notice Affidavit for April 14, 2015 Planning and Zoning Board Meeting
Ads, Mailer, & Posted Notice Affidavit for April 27, 2015 City Commission Meeting
Ads, Mailer, & Posted Notice Affidavit for May 11, 2015 City Commission Meeting